Education · Wilmington, Delaware

    Red Clay School District Window Film & C-Bond Glazing

    Roughly 6,000 square feet of window film across Red Clay Consolidated School District buildings in Wilmington, Delaware, with a C-Bond ballistic-resistant system applied at openings the district prioritized. C-Bond ballistic resistance depends on the exact tested glass, treatment, film layers and installation configuration.

    Film installed
    ~6,000 sq ft
    System at priority openings
    C-Bond
    Red Clay schools with window-film projects
    14
    William C. Lewis Dual Language Elementary School entrance with security window film in Wilmington, Delaware
    William C. Lewis Dual Language Elementary — full entry storefront package

    Project snapshot

    Client
    Red Clay Consolidated School District
    Location
    Wilmington, New Castle County, Delaware
    Sector
    K–12 public education
    Scope
    Approximately 6,000 sq ft of window film across district buildings
    System
    C-Bond ballistic window film system
    Application
    Entry and vulnerable-opening film work, C-Bond system at prioritized openings, lockdown privacy film

    The challenge

    Every district building in Delaware shares the same weak point: a glazed entry vestibule that a person can be through in seconds. Behind it are corridor glass walls and office glass with clear sightlines into occupied space.

    Replacing that glazing across a district is not financially or operationally realistic. The buildings have to keep running on the academic calendar, and the money has to harden as many openings as possible.

    Standard safety film raises the bar on forced entry but is not a ballistic product. Where the district's threat assessment called for ballistic performance, the specification had to reflect that honestly.

    Project objectives

    • Harden entry vestibules and other vulnerable openings across district buildings
    • Apply the C-Bond ballistic-resistant system where the district prioritized it, matched to the qualifying configuration
    • Add lockdown privacy on interior corridor and office glass
    • Complete the work without replacing glazing or disrupting the school year

    Why this solution

    C-Bond's system is designed for retrofit onto existing glazing. Any ballistic-resistance rating belongs to the exact tested glass, treatment, film layers and installation — not to ordinary filmed glass elsewhere in a building — so the specification follows the qualifying report for each priority opening.

    The goal of security film is delay, not a guarantee: glass that holds together longer can support lockdown procedures. No field-performance result is claimed for this project.

    Frost and blockout film on interior corridor and office glass complements the hardening: during a lockdown, an intruder can't confirm what's behind the glass.

    Installation approach

    1. 1

      Openings were assessed building by building, prioritizing entry vestibules and the glass that fronts occupied space.

    2. 2

      Each opening was measured and treated individually, with glass fully prepped before application.

    3. 3

      Work was phased around the academic calendar and building operations so schools stayed usable throughout.

    Results

    • Approximately 6,000 sq ft of window film installed across Red Clay Consolidated School District buildings
    • C-Bond ballistic system applied at the openings identified as highest priority
    • Entry vestibules at Stanton Middle School and William C. Lewis Dual Language Elementary hardened
    • Interior corridor and front office glass treated with lockdown privacy film
    • Work phased around the academic calendar and building operations

    Project photos

    Real photos from this project or program. Tap any image to view it larger.

    Stanton Middle School — entrance vestibule glass, the first barrier a threat meets
    William C. Lewis Dual Language Elementary — full entry storefront package
    Interior corridor glass — frost blocks sightlines during a lockdown
    Front office glass — blockout frost on the lower lite, daylight kept up top
    People Also Ask

    Red Clay Consolidated School District — frequently asked questions

    No. Standard safety and security film is a forced-entry delay product. A ballistic system such as C-Bond is engineered and tested for ballistic resistance and is specified only where a threat assessment calls for it.

    No. These systems are retrofit products applied to the existing glazing, which is what makes district-wide hardening financially possible.

    Yes. Work is phased around the academic calendar and building operations, including after-hours and break-period scheduling.

    Funding is applicant-specific. Districts review eligibility with their business office and the Delaware Department of Education; Shore provides scope, specification and itemized estimate documentation but does not decide eligibility or guarantee funding.

    Have a similar building or portfolio?

    Send us the scope, the plans, or just a few photos. We survey, specify, and install across Delaware and the Maryland Eastern Shore.

    • Response within one business day
    • 3M Authorized Dealer · IWFA accredited
    • Serving Delaware since 1989
    Prefer to talk? (302) 947-4624

    By submitting this form you agree that Shore Tint & More may contact you by phone, text, or email about your project. Message and data rates may apply. See our Privacy Policy.