Delaware School Security Film Guide: Systems, Specs & Planning
A practical buyer's guide for Delaware superintendents, facility directors, architects and glazing contractors — how to inventory openings, evaluate glass and frames, choose a system, and phase a budget.
Published · Last updated
This guide covers procurement and planning. For what Delaware law actually requires, read Delaware Title 14 §2306: the school security glazing law explained and Delaware SB 273 explained.
Start with the independent DSSC assessment
An authorized Delaware school contact should request a no-cost physical school safety assessment from the Delaware School Safety Center (DSSC), using its official request resource or dema.cssp@delaware.gov. DSSC describes a collaborative walkthrough, review of procedures and staff consultation, followed by written observations, strengths and actionable recommendations. This is an agency assessment, not a Shore sales survey or a statutory compliance ruling.
Prepare approved building information, an authorized staff contact and questions for the walkthrough. Agree the school's secure sharing channel before sending drawings, access procedures or vulnerability details. Do not publish the assessment or upload security plans into a public contractor inquiry.
Owner priorities become a separate glazing project
The school owner and safety lead review the recommendations, decide priorities and record approvals with finance and purchasing. Not every finding is a glazing problem. Your school’s safety, facilities and purchasing teams set the priorities. Shore documents the glazing portion, while the appropriate qualified trades address doors, cameras, access control and electrical work.
A separate Shore glazing survey inventories the selected glass and frames, dimensions, condition, candidate film and attachment and exact-system documentation. An itemized estimate identifies access, preparation, exclusions and installation phases. It does not replace the DSSC assessment, decide eligibility or authorize a purchase. Delaware districts can request a no-cost Shore glazing survey. Contact us to confirm the survey scope and cost for other facility types.
Public LEAs, vo-tech districts and charters: review existing funds first
Ask the business office and Delaware Department of Education to review §4140, the current allocation and available balance, and whether the proposed scope is approved. A fund reference is not a promise of available money or automatic film eligibility. Charter schools must confirm the major-capital restriction: these funds cannot be used for major capital improvements. Keep the approved scope and funding determination in the project file.
COPS SVPP: eligibility and application status
The FY26 School Violence Prevention Program is CLOSED. No FY27 opening was verified for this November 5, 2026 review. Qualifying public applicants include eligible governmental entities and public agencies such as school districts; private schools and individual schools that do not operate as districts are not primary applicants. For a future round, confirm funding limits, required local contributions and deadlines in the new notice.
Churches and qualifying nonprofits: confirm NSGP with DEMA
NSGP through DEMA is competitive and reimbursement-based. The federal FY26 listing is archived; it is not Delaware's application deadline. Historical FY26 Appendix A, printed page 62, expressly lists window films under 14EX-00-BSIR. This is evidence from that cycle, not blanket eligibility: ask DEMA to approve the exact current scope, applicant, documentation and purchasing pathway before committing costs.
Start with an opening inventory, not a product
Every defensible school glazing project starts the same way: a written inventory of the openings you are actually considering. Walk the building with floor plans and record each opening's location, approximate size, glass type (annealed, tempered, laminated, insulated), frame material and depth, glazing method (wet-glazed, gasket, stop-and-bead), and its role in the entry sequence.
Group the inventory by function rather than by wall. The secured vestibule, the reception and visitor-screening glass, the main entry doors and sidelites, and ground-floor classroom glass along accessible elevations behave differently in a threat scenario and carry different costs. A district that can hand a bidder a categorized opening schedule gets comparable proposals; a district that asks for “a price on security film” gets numbers that cannot be compared to each other.
This inventory is also the document that survives staff turnover. It becomes the baseline for phasing, for future capital requests, and for demonstrating to a board that the scope was chosen deliberately.
Evaluate glass, frame and attachment together
Security film performance is a property of the whole assembly, not the film alone. The same film on the same glass performs very differently depending on whether the film is daylight-applied (trimmed inside the visible glass edge), edge-to-edge under the stop, or anchored with a wet-glaze or mechanical attachment system that ties the filmed glass into the frame.
Frame condition matters as much as the film thickness. Corroded aluminum, soft or failing sealant, shallow bites, and loose stops all reduce what an attachment system can do. Insulated units add another consideration, because film is applied to one lite of a sealed unit and the sealed-unit manufacturer's guidance should be reviewed before specifying anything on the interior pane.
Tempered glass, laminated glass and annealed glass each fail in a different way, so identify glass type per opening during the survey rather than assuming a building-wide answer. A building may contain more than one glass type across a single elevation.
Selecting a system: film, attachment, or tested assembly
There are three broad paths, and they are not interchangeable. Applied safety and security film with a daylight application is the lightest-touch option: it supports fragment retention if the pane breaks, but the glass can still be pushed out of the frame. Security film with an engineered attachment system — a structural sealant or mechanical anchor connecting the filmed glass to the frame — ties the filmed glass into the opening, and a forced-entry-delay specification should evaluate whether an engineered attachment is part of the documented complete assembly. Ballistic-resistant glazing is a separate category entirely: a complete tested assembly of specified glass, interlayers and framing documented by the manufacturer.
Standard security film is not a ballistic-resistant material, and Delaware's statute now says so explicitly. Treat any proposal that presents applied film as a ballistic product as a red flag, and read the law explainer before writing spec language.
Choose per opening group, not per building. Select systems by opening group based on the survey and the project's design requirements — for example, an attached security film assembly at the vestibule and visitor-screening glass, lighter safety film on classroom glass for fragment retention, and a tested ballistic-resistant assembly only where the project's threat analysis calls for one.
Documentation to require before you sign
Ask for the manufacturer's product data sheet for the exact film being proposed, the attachment system's data and installation instructions, and — where any performance level is claimed — the test report for the complete configuration, including the glass makeup and frame used in that test. A performance claim without the tested configuration behind it is marketing.
Require the installer's manufacturer authorization, current insurance, and a written warranty that names both the film manufacturer's warranty and the installer's labor coverage. Ask what the warranty says about seal failure on insulated units and about attachment system adhesion.
Finally, require an as-built opening schedule at closeout: which product went on which opening, with which attachment method. This is the document that makes phase two easy.
Questions to ask every bidder
Which exact film and attachment product are you proposing, and can you provide the data sheets? What tested configuration supports any performance claim you are making, and does that test use our glass and frame type? How do you handle openings where the frame condition will not support the attachment system you priced?
Who performs the work, and are they employees or subcontractors? How will you sequence around occupied instructional space, and what cure time does the attachment system need before the area returns to normal use? What does your proposal exclude — glass replacement, frame repair, sealant remediation, after-hours premiums?
Ask each bidder to price the same categorized opening schedule. If two proposals differ by a large margin, the difference is usually attachment method or scope, not film cost.
Budgeting and phasing
Cost per square foot varies with film build, attachment method, access (ladder versus lift versus scaffold), and whether work happens during school hours. Attachment systems add meaningful labor and cure time relative to daylight application, so a phase priced with attachment cannot be compared to a phase priced without it.
One possible phasing pattern for existing Delaware buildings: phase one covers the secured vestibule and visitor-screening glass, phase two covers remaining ground-floor accessible glazing, and phase three covers interior office and administrative glass. Phasing by risk keeps each capital request defensible and lets a district start with a smaller, fundable number.
Build contingency for frame repair discovered during installation, and confirm whether your project is a voluntary retrofit or falls under a statute-triggering new construction or major renovation, because that changes who reviews the design.
Installation planning
Schedules depend on the opening count, the specified configuration, site access, attachment and cure requirements, and facility operations. Summer breaks and long weekends are the easiest windows, but attached systems need dust control and stable temperature, so an empty building is not automatically a fast building.
Plan for glass cleaning and prep, protection of adjacent finishes, a staging area for material, and a punch walk with the facilities director at the end of each phase. Confirm who is responsible for removing existing failed film, if present, because removal adds labor.
Communicate to staff that the appearance of the glass will change slightly at the edges where attachment is used, and that lightly hazy or slightly milky appearance during the film's cure period is normal.
Next steps
If you are early in the process, start with the opening inventory and read the current-law explainer so your spec language matches Delaware Code Title 14 §2306 rather than older bill-number shorthand. If you already have plans in hand, a glazing survey against those plans produces the categorized opening schedule bidders need.
Planning a Delaware school glazing project?
We survey every opening, document product options, and deliver a board-ready report with phased pricing.
Frequently Asked Questions
Is standard security film ballistic-resistant?
No. Standard security film is a glass-retention and forced-entry-delay product, not a ballistic-resistant material. Ballistic resistance belongs to complete tested assemblies documented by a manufacturer, and Delaware's statute treats the two as distinct categories.
Do Delaware schools have to install security film?
Delaware Code Title 14 §2306 applies to new school construction and major renovations, and lists ballistic-resistant glass, other ballistic-resistant material, or security film for secured vestibule, lobby, and visitor-screening office areas. Hardening an existing building outside a qualifying project is a voluntary district decision.
What is the difference between daylight-applied film and an attachment system?
Daylight-applied film stops inside the visible glass edge and helps hold broken glass together. An attachment system bonds or mechanically anchors the filmed glass to the frame so the pane is harder to push out of the opening; forced-entry-delay specifications are evaluated against the complete tested assembly, not the film alone.
How should a district budget a school glazing project?
Price a categorized opening schedule rather than a lump-sum building number, separate daylight-applied scope from attached scope, and phase by risk starting at the secured vestibule and visitor-screening glass. Carry contingency for frame or sealant repair found during installation.
Can film be installed on insulated or tempered glass?
Often, but it depends on the specific unit. Glass type, unit construction, and orientation should be recorded per opening during the survey, and the sealed-unit manufacturer's guidance reviewed before specifying film on one lite of an insulated unit.